Week of January 12

Swanville Construction takes a break from blowing attic insulation. Note the layer of spray foam insulation already applied to walls in background.
With the ground finally thawed, Paul Ripplinger and crew gets to work on plumbing rough in.Looking toward the future wood shop section, the finished product looks great!

You wouldn't believe how quickly Dean Lange and sons installed the floor heat tubing. It sits atop 2" of foam insulation.

A beautiful morning for concrete, don't you think? A pumper truck gets the product where is needs to go in the building.

Just like frosting a cake, right guys?

Jim uses a power trowel to get a perfect finish. Is there anything this guy CAN'T do?!